Boiler barrel lagged and cladding fitted
Despite some freezing temperatures, work on 01 1104 continued in January. The boiler barrel cladding sheets were prepared for fitting, the boiler barrel was lagged and some of the sheets have already been refitted:




The front air damper was newly made and various cladding sheets were repaired:


Preparations were made for installing the radio: the housing of the control unit was mounted in the appropriate place, the aerial was fitted and the tender body was prepared to take the radio set.