Welding work on the tender, new air reservoirs

On the tender, our colleagues at Eisenbahnwerkstätten Krefeld (EWK) are currently finishing the welding work on the water tank and the frame. Among other things, new beading strips, which are characteristic of the T38 tender, have been riveted on; the complete mechanism of the tender water valves and the outlets to the loco's two pumps (injector and piston feed pump) have been reconditioned or renewed in stainless steel; and the air reservoirs and brake cylinders that we bought new have been fitted. The picture immediately below was kindly provided to us by EWK:

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

The brake block holders have also been reconditioned:

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

We are giving intensive support here with painting, to make sure that everything is protected and in the end neatly painted RED, including places that will later be inaccessible. At last, here too, there is motivating finishing work again, especially on the tender frame, where for months our own volunteers had needle-gunned and scraped away dirt and rust…:

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

In the cab we have started on the "floor" job; other work depends on its completion in turn, such as the back panels and the final securing of the various pipes and cables that run over, under or through the floor. The absolute highlight here has been seeing and working the oak, and imagining how it will look in the future. The firm Holzland Roeren in Krefeld (many thanks to them at this point) has made us floorboards from a red oak to the original drawing, boards that many people would love to have in their living room:

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirsWelding work on the tender, new air reservoirs

At present we are also busy at home casting the firebox brickwork and brick arch bricks. Around 1.5 tonnes of material have already been painstakingly processed and turned into precise bricks to the drawing. By the end there will be another 1.5 tonnes before everything can be delivered for firing and finally to the firebox for installation:

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

As always, of course, our thanks go to our hard-working team, whether in the workshop on site, in the cellar at home or at the computer at home...

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs

Welding work on the tender, new air reservoirs