Front tube plate welded in, flue tubes machined
Eisenbahnwerkstätten Krefeld (EWK) has finished welding in the front tube plate, which also included new stays on the water side. The tubes themselves have been machined; for the large flue tubes this was done in the workshop of the museum in Darmstadt-Kranichstein. At the same time we have exposed the underside of the first boiler ring again, i.e. removed the cladding and lagging, so that the boiler can be supported here and the smokebox can be repaired. For the smokebox repair, the firm Regeniter has made complex parts for us as a donation.



On the running gear, EWK has meanwhile finish-machined the axlebox guides and reconditioned the axlebox wedges.


In addition, work has started on line-boring the drawbar pin bush under the cab, and the sway wedges under the firebox backplate have been removed and reconditioned.

On the tender, our own volunteers were able to clean the last corners at the bottom of the frame and continue needle-gunning the outer frame plates.


In the meantime EWK had dropped the wheelsets out of the tender bogie, which gave our "Team West" another cleaning job. The tender wheelsets and the bogie are due to go shortly to the firm Spoo&Esters, which is carrying out the sandblasting for us as a donation.


In Crailsheim the brake rigging of the Gbs-uv has gradually been reconditioned and painted. We were also able to repair the injector feed pipe, which was damaged when the loco was lifted by crane in Rotterdam in 1975, and pressure-test it with water.



As a rather demanding project, the first moulds for the firebricks of the firebox brickwork are being made. The small brick-like firebrick, which is the most common one with around 350 pieces, will then gradually be cast by volunteers at home, and further moulds for the brick arch bricks and the large firebox lining bricks will follow.