Re-tyred wheelsets back and primed
The newly arrived wheelsets of the bogie and the trailing (Adams) axle have been primed. Over the past few weeks the wheelsets were re-tyred at a specialist workshop:


Eisenbahnwerkstätten Krefeld (EWK) have meanwhile pressed the new support bushes of the piston rod guide into the housing. The bogie is still being worked on, as is the fitted-bolt job in the frames:


Next, the large coupled wheelsets are to be primed; they too are back from machining at an outside contractor:

