Progress has been made in both Krefeld and Crailsheim. In Krefeld, the cleaning work continues:


At Eisenbahnwerkstätten Krefeld (EWK), the spring compensation is close to completion. It was in very poor condition, and considerably more work was needed than planned. In the frames, EWK staff are renewing fitted bolts and line-boring the holes. The entire loco has been aligned and set exactly level so that the frames can now be measured.
In Crailsheim, the oil tank has now been given a first coat of filler and is at least black again. On the Gbs, we have started removing the damaged timber boards, and we will most likely have to replace a great deal here. The steam inlet cladding was also repaired and cleaned in Crailsheim.